A successful refurbishment should improve the way your business works. The planning needs to protect that work while the changes take place.
For many businesses, the concern about an office refurbishment is less about choosing furniture or finishes and more about keeping the organisation running. Customers still need answers. Orders still need processing. Staff still need somewhere suitable to work.
That concern is reasonable. Even a relatively modest project can affect access, noise levels, meeting space and IT connections. A larger refurbishment may require teams to move temporarily or parts of the premises to close.
There is no honest promise that every refurbishment can happen without any interruption. However, disruption becomes much easier to manage when business continuity forms part of the brief from the beginning. The aim is to make each change deliberate, understood and proportionate to the benefit it delivers.
Principle One: Start With How the Business Needs to Operate
Before discussing installation dates, establish what must continue throughout the project. A customer service team may need uninterrupted telephone access. Finance may have payroll deadlines that cannot move. A reception area may need to remain available to visitors, while a meeting room could be released for several weeks.
Ask each department to identify its essential activities, busy periods and dependencies. Include the less visible requirements: secure records, printers, deliveries, accessible routes and places for confidential conversations. A temporary desk is only useful if the person using it can still do their job.
Turn those findings into a short continuity brief. Record which functions must remain available, what temporary arrangements are acceptable and who can approve a planned interruption. This gives the project team something concrete to plan around.
It also helps define the scope. If the real difficulty is circulation or poorly positioned storage, reviewing your office space planning may reveal a more focused solution than a complete refurbishment.
Principle Two: Agree the Destination Before Dividing the Journey
Phasing a project can reduce the number of people affected at once, but the final workplace still needs to be planned as a whole. Otherwise, one department may be completed only to be disturbed again when a later phase needs access to the same services or circulation route.
Agree the intended layout, retained furniture, storage requirements and key infrastructure before work begins. Check measurements and practical details such as door openings, delivery access and the position of power and data connections. Decisions left until installation can become delays when teams are waiting to move back.
Be clear about the type of work involved. Our guide to office fit out and office refurbishment explains the different starting points. A furniture refresh and a project involving partitions, flooring and services need different programmes and temporary arrangements.
A clear design does not prevent every change. It does provide a basis for judging whether a proposed change is necessary, what it affects and whether it should wait.
Principle Three: Choose Phases Around Dependencies, Not Just Departments
Working through the office one department at a time sounds straightforward. In practice, the best sequence often depends on the work itself. Flooring may need a clear area. Electrical work may affect more than one room. A delivery route may pass through a department that is otherwise outside the project.
Ask the people delivering the work to explain the sequence and the reasons behind it. Identify which activities must finish before others can begin, which areas can be occupied safely and when each space will be ready for its next use.
For example, a spare meeting room might become temporary accommodation for one team. Once that team’s area is completed and checked, they can move back and release the temporary room for the next group. This only works if the temporary space has enough suitable workstations, connections and capacity.
Compare this with a short, more concentrated closure where appropriate. Repeated moves and several weeks of background disturbance may be harder to manage than a planned interruption. The right choice depends on your premises and operations, rather than a rule that phased work is always better.

Principle Four: Treat Temporary Working Arrangements as Part of the Project
Temporary arrangements deserve the same practical attention as the finished office. Staff need suitable seating, working equipment, access to shared information and a clear understanding of where they will be based.
If home or hybrid working is proposed, check that the affected roles can actually operate that way. Some employees may need equipment, secure access or an alternative location. Others may have responsibilities that require them to remain on site.
Plan IT moves with the people responsible for your systems. Agree how equipment will be labelled, disconnected, moved, reconnected and tested. Confirm who will be available if phones, network access or printers do not work when the team returns. A room full of installed desks is not yet a functioning workplace.
Use the same discipline for files and personal belongings. Clearly labelled crates and an agreed storage location make a return move easier and reduce time spent searching for everyday essentials.
Principle Five: Schedule the Most Disruptive Work Deliberately
Not all refurbishment activities create the same disturbance. Furniture assembly, drilling, removal work and service interruptions each affect the business differently. Identify the activities that will interfere with concentration, customer contact or access, then agree suitable windows for them.
Evening or weekend work may be useful, but it needs planning. Building access, supervision, delivery availability and the cost of out-of-hours attendance all need to be agreed. There must also be enough time to check the space before employees return.
Do not build a programme that depends on every task finishing at the last possible moment. Allow a realistic margin between installation and business-critical use. If an area must be available for an important client meeting on Monday, its readiness should be checked before Monday morning.
Safe separation between occupied areas and work areas should be agreed with the responsible project professionals. Staff and visitors need clear routes and instructions throughout each phase. If a space cannot be used safely, continuity planning needs to provide another arrangement.
Principle Six: Make Communication and Decisions Someone's Responsibility
Disruption becomes more frustrating when people do not know what is happening. A short, reliable update is often more useful than a detailed programme that nobody reads.
Give staff a clear outline of what will change, when their area will be affected, where they should work and whom to contact. Update that information when the programme changes. Include reception teams and anyone responsible for visitors or deliveries, so they can give accurate directions.
Nominate one internal project contact with the authority to gather decisions and coordinate with suppliers. Agree who covers that role when they are unavailable. Unanswered questions about a finish, access arrangement or delivery can hold up work that was otherwise ready to proceed.
Changes should be recorded with their effect on cost, timing and occupied areas. A small addition may be worthwhile, but the decision should include its consequences for the business.
Principle Seven: Plan the Return to Work, Not Just the Installation
Completion should mean that the space is ready to support normal work. Before a team moves back, check furniture positioning, equipment connections, storage access and the practical operation of the room. Record outstanding items and agree who will resolve them.
Introduce employees to new furniture adjustments and explain any changes to shared spaces or storage. Review the workplace after people have used it: a layout that looked sensible on a drawing may need a small adjustment once normal activity resumes.
Keep the budget equally practical. Include temporary moves, IT support, protection, removal, cleaning and contingency where relevant. Comparing only furniture and installation prices can leave essential continuity costs outside the plan.

The Lomas Refurbishment Planning Approach
At Lomas, a practical refurbishment begins with three connected decisions.
Protect what must continue. Understand the activities, people and facilities the business depends on.
Sequence what needs to change. Build the programme around access, dependencies and workable temporary arrangements.
Check what is ready. Confirm that each completed area can function before the next move takes place.
Our office refurbishment service brings workplace planning, furniture and project coordination together, helping businesses across Blackburn and Lancashire consider the finished environment and the practical route to achieving it.
Frequently Asked Questions
Can an office stay open during a refurbishment?
Often, parts of it can. That depends on the scope, the premises and whether occupied areas can remain suitable and safely separated from the work. Some activities may require a temporary closure or a planned interruption. Establish this during the site assessment rather than assuming everyone can remain at their desks.
Is it better to refurbish in phases or complete everything at once?
Phasing can keep part of the workplace available and spread the work, but it may involve repeated moves and longer overall disturbance. A concentrated project can shorten that period if the business has a workable temporary arrangement. Compare both against your operating needs and the actual sequence of work.
How far ahead should we plan an office refurbishment?
Start before committing to a completion date. Allow time for the survey, design decisions, any necessary permissions, product lead times and contractor scheduling. The appropriate lead time varies with the project. Ask for a programme based on confirmed requirements and availability.
Does working at weekends remove the need for temporary arrangements?
No. Some work may take longer than a weekend, and cleaning, reconnection and testing still need time. Out-of-hours work can reduce disruption when it is feasible, but the plan should include what happens if an area is not ready when expected.
Do we need to replace all our furniture during a refurbishment?
No. Assess existing furniture for condition, suitability and compatibility with the new layout. Retaining appropriate items can reduce expenditure and unnecessary replacement. Include any moving, storage and reinstallation requirements in the programme.
What should we ask a refurbishment partner before work begins?
Ask who coordinates the project, how occupied areas will be managed, which interruptions are expected and what is included in the price. Agree responsibilities for IT, deliveries, removal, cleaning and handover. You should also know how changes and delays will be communicated.
Creating a Better Workplace While Keeping the Business Moving
Planning an office refurbishment is an operational decision as well as a design decision. The strongest plan gives equal attention to the workplace you want and the activities that must continue while it is created.
When the scope is clear, the sequence is realistic and people understand the arrangements, refurbishment becomes a manageable series of steps. The business can prepare for necessary interruptions instead of reacting to avoidable surprises.
If you are considering improvements to your premises, speak to Lomas about your refurbishment plans. We can help you explore a practical approach around your workplace, priorities and day-to-day operations.
The Lomas Principle
A better office begins with a plan that respects the business already working inside it.